IWS Maxijet Long Lead Tank Pump

£54.95

The IWS MaxiJet 1000 Tank Pump is a replacement pump that can be used with all IWS Flood and Drain systems. Comes complete with a 10M lead and blue connector for use with the IWS Flood and Drain Timer and Controller.

In stock

SKU: 100390 Categories: ,